SCOPE: Design, supply and installation of upgrade to 22kV intake, power
distribution system, traction supply, LV distribution and PSCADA for all
substations, Depot and Wayside.
RESPONSIBILITIES:
- Managed team of design engineers and drafters in order to produce all equipment
layout drawings, cable routing drawings, civil work guidelines and mounting standards for Bulk Sub-Stations, Traction Power Sub-Stations and other areas as required - Ensured compliance with contract specification throughout the project
- Co-ordinated with sub-contractors to ensure work was carried out to schedule and up to quality standards
- Provided technical support to construction team with regards to installation design issues
- Management of design changes due to issues arising during construction
- Design of new electrical equipment and validation through site mock-up
- Presentation of proposals to LTA senior management and Deputy Group Director
- Led challenging brown-field project which required equipment to be migrated from existing to new while maintaining full service